THE NEW TRANSIT NETWORK PROPOSED FOR CENTRAL TEXAS 

We’re ready to show you our new network! The Connections 2025 Draft Plan would establish a more frequent, more reliable and more connected transit system. The plan triples Capital Metro’s High-Frequency Route Network from six to 17 routes, adds two MetroRapid lines, with more east/west service, straighter routes and better system connectivity. The plan adds two MetroRapid lines, additional stations 1/3 mile apart, 7-10 minute frequency, and Local fares instead of Premium. By focusing on frequency, many new routes could operate at 15 minutes or better, with others at 30 minutes.

Connections 2025 also aims to create a stronger, easier- to- navigate system by creating a single flat fare for Local and Premium service, for easy boarding and simplified transfers.

View the interactive map and proposed route-by-route changes! Share your feedback by taking our survey, visiting an open house Sept. 6-16 or joining our webinar on Sept. 14.

VIEW THE DRAFT PLAN & TAKE SURVEY

DRAFT PLAN OVERVIEW VIDEO 

En Español

YOUR INPUT MATTERS!

We need your feedback before the draft plan becomes our roadmap for the future. After viewing the interactive map and draft plan, complete the survey below to share your input. Or, talk to us in person by visiting an open house Sept. 6-16.

TAKE THE SURVEY

ABOUT THE STUDY

Capital Metro has contracted with a planning consultant to conduct an in-depth review of the transit system through a new study called Connections 2025.

VIEW THE FAQs

JOIN THE MAILING LIST

Opportunities for public involvement will occur throughout the project, with both in-person events and ongoing engagement online. Please join our mailing list to receive regular updates.

Your Name (required):
Your Email (required):

LET’S WORK TOGETHER

As the Central Texas community evolves, so do the transit needs and services provided by our agency.